Our Credentials

HDD Method

Supply & Installation of 2-Way 200mm & 110mm HDPE Pipes

Contractor: Global Chemicals & Maintenance Systems LLC

Client: Marsa L&G Plant

Location: Sohar Port

Scope: Supply and installation of dual-diameter HDPE piping systems within the plant facility.

HDD Method

Supply & Installation of 4-Way, 6-Way, 8-Way & 12-Way 110mm HDPE Pipes

Contractor: Barik Group

Client: Sultan Haitham City

Location: Mabela Area

Scope: Specialized HDD road crossing installations for multi-way duct configurations.

HDD Method

Supply & Installation of 110mm HDPE Pipe

Contractor: MHD (Yellow Shine Investment)

Client: Ooredoo & Omantel

Location: Ruwi & Al Ansab Area

Scope: Supply and HDD road crossing installation for 110mm HDPE infrastructure in high-traffic urban areas.

HDD Method

Installation of 400mm HDPE Pipe

Contractor: Colossal Engineering & Construction LLC

Client: Nama Water

Location: Al Amerat Area

Scope: Specialized HDD road crossing for large-scale water infrastructure.

HDD Method

Supply & Installation of 110mm HDPE Pipe

Contractor: OHI (Anwar Zquit International)

Client: OBB

Location: Rustaq Area

Scope: Specialized HDD road crossing and supply of 110mm HDPE piping for infrastructure development.

HDD Method

Supply & Installation of 2-Way 110mm HDPE Pipe

Contractor: Barik Group

Client: Ooredoo

Location: Al Ansab Area

Scope: Horizontal Directional Drilling (HDD) for 2-way road crossing and pipe supply.

HDD Method

Installation of 160mm HDPE Pipe

Contractor: Bin Salim

Client: Nama Electricity

Location: Al Amarat Area

Scope: Specialized HDD road crossing for 160mm diameter HDPE piping systems.

HDD Method

Supply & Installation of 200mm HDPE Pipe

Contractor: Engineers Union Technology LLC

Location: Ghala Area

Scope: Full supply and horizontal directional drilling (HDD) installation for road crossing infrastructure.

HDD Method

Supply & Installation of 2-Way 110mm HDPE Pipe

Contractor: 4TRUST

Client: Ministry of Defense (MOD)

Location: Nizwa Area

Scope: Specialized HDD road crossing for military-grade infrastructure deployment.

HDD Method

Installation of 200mm HDPE Pipe

Contractor: Manahil Middle East LLC

Client: Nama Electricity

Location: Rusayl Area

Scope: HDD road crossing installation for 200mm HDPE piping to support Nama Electricity infrastructure.

HDD Method

Installation of 200mm HDPE Pipe

Contractor: SCAN Electromechanical

Client: Nama Electricity

Location: Nakhal Area

Scope: Specialized HDD road crossing for electrical infrastructure deployment.

HDD Method

Supply & Installation of 160mm HDPE Pipe

Contractor: Al Majadeef Trading LLC

Client: Nama Water

Location: Al Amarat Area

Scope: Supply and specialized HDD road crossing for water utility infrastructure.

HDD Method

Supply & Installation of 225mm & 400mm HDPE Pipes

Client: Global Chemical & Maintenance Systems LLC

Client: Sohar Freezone

Location: Sohar Port

Scope: Road crossing installation utilizing Horizontal Directional Drilling (HDD) for large diameter HDPE piping.

Gas Pipeline

Installation of 16″ + 6″ Gas Pipeline

Contractor: CORRETECH International

Distance: 1500 Meters

Terrain: Specialized HDD in Rocky Terrain

Scope: Large-scale gas infrastructure installation requiring advanced HDD drilling through high-density rock formations.

Gas Pipeline

Installation of 12″ + 5″ Gas Pipeline

Contractor: Likhitha Infrastructure

Distance: 500 Meters (Total)

Complexity: 6 Crossings in Rocky Terrain

Scope: Precise HDD method application for multiple gas pipeline crossings under challenging rocky conditions.

Gas Pipeline

Installation of 8″ Gas Pipeline

Contractor: MAS Constructions

Distance: 450 Meters

Condition: Rocky Terrain

Scope: Single-crossing HDD installation of high-pressure gas pipeline through challenging geological formations.